Bathroom Renovations in Pottsville

Complete Bathroom Renovations Managed From Start To Finish

Planning a bathroom renovation involves more than choosing tiles and fixtures. Plumbing, waterproofing, electrical work, tiling and finishing all need to happen in the right order to keep the project organised and avoid unnecessary delays.

AR Plumbing Service provides complete bathroom renovations in Pottsville, across the Tweed Coast, Northern Rivers and parts of Byron Shire, coordinating the plumbing work and associated trades required to bring your renovation plans together.

Whether you are updating an older bathroom, improving the layout or creating a completely new wet area, our team can help manage the plumbing requirements and guide you through the process from initial consultation through to completion. 

Planning a bathroom renovation?

What A Full Bathroom Renovation Includes

A complete renovation covers every stage of the project, with each trade scheduled in the correct sequence to avoid delays and rework.

Plumbing rough-in

Relocating or installing water supply lines, waste pipes, and drainage connections to suit the new layout. This is where tap positions, shower locations, toilet placement, and bath connections are set.

Waterproofing

Membrane applied to wet areas in compliance with Australian Standard AS 3740. Waterproofing must be completed and inspected before tiling can begin.

Strip-out and demolition

Removing existing fixtures, tiles, linings, and fittings. Waste is cleared from the site.

Tiling

Floor and wall tiles installed, including feature walls, niches, and shower recesses.

Fixture installation

Vanities, basins, toilets, shower screens, mirrors, tapware, and accessories fitted and connected.

Electrical work

Lighting, exhaust fans, heated towel rails, and power points installed by a licensed electrician.

Painting and finishing

Walls, ceilings, door frames, and trims painted to complete the room.

Final plumbing fit-off

All fixtures connected, tested for leaks, and confirmed working before handover.

Recent Bathroom Renovation Projects

What To Expect From
The Renovation Process

#1: Initial Consultation

The plumber visits the property to discuss the layout, fixtures, budget, and timeline. Measurements are taken and the scope is confirmed.

#2: Fixed Price Quote

A detailed quote covers all trades, materials, fixtures, and finishes. The homeowner reviews and approves before any work begins.

#3: Demolition And Strip-Out

Existing bathroom removed and waste cleared. The space is prepared for the new layout.

#4: Plumbing And Electrical Rough-In

Supply, waste, and drainage lines installed . Electrical wiring for lights, fans, and power points completed.

#5: Waterproofing And Tiling

Wet area membrane applied, inspected, and tiled. Feature walls and niches completed.

#6: Fixture Installation and Fit-Off

Vanity, toilet, shower, tapware, and accessories installed and connected.

#7: Final Inspection And Handover

The completed bathroom is tested, cleaned, and handed over with all fixtures confirmed working.

The timeline depends on the bathroom size, layout complexity, and fixture lead times. Most standard bathroom renovations take two to four weeks from demolition to handover.

Why One Team Managing The Entire Renovation Matters

A bathroom renovation involves plumbing, waterproofing, tiling, electrical, painting, and carpentry, and each trade depends on the one before it is completed correctly and on time. When one trade runs late or a stage is done out of sequence, the entire project stalls.

AR Plumbing Service coordinates all trades involved in the renovation, scheduling each stage so the work flows without gaps or clashes. The homeowner has one point of contact for the project, one quote covering the full scope, and a clear timeline from strip-out to handover.

This approach is especially useful for homeowners who do not want to manage multiple tradespeople, chase schedules, or deal with conflicting advice from different contractors.

Why Choose us

Why Choose AR Plumbing Service For Bathroom Renovations

Full project management — all trades are provided, coordinated, and scheduled by one team.

Fixed price quoting — the full renovation scope is quoted in writing before any work begins. No surprises during the build.

No callout fee — the initial site visit and design discussion cost nothing.

20 years of experience — practical knowledge of plumbing layouts, waterproofing, and building sequences across older fibro, brick, and newer homes in the Tweed.

Quality fixtures and fittings — access to products from Caroma, Rinnai, and other established brands.

Testimonials

Recent Customer Feedback

Homeowners across the Tweed Shire use AR Plumbing Service for bathroom renovations, plumbing upgrades, and wet area refurbishments.
Google
Tania Sheppard profile picture
Tania Sheppard
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Called Aiden in a panic after cutting a water hose on my fridge I thought was disconnected and he sent Kieran around within 10 min who fixed the issue with a smile and very quickly. Also checked and made sure everything was working before he left Highly recommended and more than 🌟🌟🌟🌟🌟 stars 🌟 in my book! Thank you
Google
Lorriane McCormack profile picture
Lorriane McCormack
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Highly recommend these guys, fast and efficient service at short notice today
Google
Joshua Holland profile picture
Joshua Holland
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Highly recommend. Great to have a trade turn up on time and do a good honest job. Will use again for sure, thanks guys.
Google
Lina Noonan profile picture
Lina Noonan
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
On more than one occasion Ayden has gone above and beyond to make sure that we did not have to have cold showers! Cant recommend his prompt service highly enough.
Google
karen wightman profile picture
karen wightman
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Working with Ayden of AR Plumbing Service and his dream team from the start of the project to completion has been outstanding. Ayden is both personable and professional making the experience stress free. The workmanship is extremely high quality with every attention to detail. I am beyond excited about my new bathroom and kitchen… a total dream come true, thank you so very much🌟.
Google
Jordan Harman profile picture
Jordan Harman
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The AR plumbing team is always prompt with great, personable service. Highly recommend
Google
Philip Wells profile picture
Philip Wells
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Ayden is an awesome plumber that really cares about his customers. I would highly reckoned you make use of his services.
Google
Janelle Bailey profile picture
Janelle Bailey
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Excellent service, they went out of their way to get my job done as soon as possible. They were prompt, friendly and very professional.I will certainly use them again.
Google
Julee Stacey profile picture
Julee Stacey
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Aiden was professional and quick service..
FAQs

Bathroom Renovation FAQs

Most standard bathroom renovations take two to four weeks from strip-out to completion. Larger or more complex layouts, custom fixtures, or heritage properties may take longer. The timeline is discussed during the quoting stage so the homeowner knows what to expect.

Yes, in most cases. The bathroom being renovated will be out of service during the project, so a second bathroom or temporary arrangement is needed. The team works to keep disruption to the rest of the house to a minimum.

Having tiles, tapware, and fixtures selected before the quote helps provide an accurate price. If selections are still being finalised, the plumber can quote based on an allowance and adjust once final choices are confirmed.

Yes. Waterproofing is completed in compliance with Australian Standard AS 3740. The membrane is applied and inspected before tiling begins to ensure the wet area is properly sealed.

AR Plumbing Services

Start Planning Your Bathroom Renovation

Whether you are updating an existing bathroom or creating a new wet area, AR Plumbing Service can help with the plumbing requirements and renovation process. Call 0431 875 044 or contact the team today to discuss your bathroom renovation plans and request a quote.